Modular conveyors · rollers · crossbelt sortation

Interroll conveyor programs with clear requirements before capital locks

Map receiving, storage, picking, sortation and shipping against load units, SKU mix, peak windows and WMS/WCS/PLC ownership. Interroll keeps evaluation attached to the material-flow path your distribution center actually runs—so drum motors, rollers and sorter modules are compared with the same acceptance gates.

Warehouse material flow map from receiving through shipping
  • Receive
  • Store
  • Pick
  • Sort
  • Ship
Throughput Validation

Rate checked against SKU mix, order profile, peak window, accumulation and exception recovery.

Controls Matrix

WMS, WCS, WES, PLC and sorter ownership for commands, alarms and FAT/SAT evidence.

Serviceability

Maintenance access, diagnostics and critical spares visible before operational handover.

Phased Delivery

Cutover windows, fallback states and measurable acceptance gates that protect live waves.

Equipment families

Interroll modules evaluated as one material-flow boundary

Product conversations stay attached to divert accuracy, zero-pressure accumulation, drum-motor duty and the control layer that must own each handshake.

Modular conveyor platform in a distribution aisle

Modular conveyor platforms

Belt and roller modules sized to load units, merge logic and buffer occupancy—not isolated meters-per-minute claims.

MCPMergeZPA
Review catalog →
Conveyor rollers and drum motor assembly

Rollers & drum motors

Drive placement, duty cycle and access for replacement stay paired with the lane’s peak window and SKU abrasion profile.

Drum motorRollersDuty
Review catalog →
Crossbelt sorter on a distribution mezzanine

Crossbelt sorters

Divert accuracy, recirculation limits and induction balance reviewed against order-line structure and cutoff windows.

SortationDivertRecirc
Review catalog →
Evaluation discipline

Six Interroll checkpoints before brochure rates become design rates

Load-unit contract

Carton, tote or pallet dimensions, weight bands and overhang rules freeze before module selection.

Peak window math

Design rate, peak factor and recovery time after jam or recirculation stay in one record.

Interface ownership

WMS, WCS, PLC and sorter handshake states name who may authorize restart after a stop.

Accumulation depth

Zero-pressure zones and buffer occupancy limits pair with induction balance assumptions.

Access & spares

Roller, drum-motor and sorter access paths appear before go-live, with critical spare lists.

FAT / SAT gates

Acceptance cases attach to divert samples, alarm ownership and live load assumptions.

Operating profiles

Industries where Interroll starts from the flow model

Compare SKU depth, peak factor, temperature band and pallet/tote mix before locking conveyor architecture. Planning ranges are scaffolds, not certified throughput claims.

Vertical SKU depth Peak factor Temperature Load-unit mix
E-commerce fulfillment Very high 1.6–2.4× Ambient Carton / polybag heavy
Grocery distribution High 1.4–1.9× Mixed zones Tote + case + pallet
Parcel & hub induction High 1.5–2.2× Ambient Parcel / polybag
Manufacturing supply Medium 1.2–1.6× Ambient Pallet / tote to line
Multi-client DCs Client-variable Stacked peaks Usually ambient Mixed by contract

E-commerce fulfillment

SKU depth very high · Peak 1.6–2.4× · Ambient · Carton / polybag heavy

Grocery distribution

SKU depth high · Peak 1.4–1.9× · Mixed zones · Tote + case + pallet

Parcel & hub induction

SKU depth high · Peak 1.5–2.2× · Ambient · Parcel / polybag

Manufacturing supply

SKU depth medium · Peak 1.2–1.6× · Ambient · Pallet / tote to line

Multi-client DCs

Client-variable depth · Stacked peaks · Usually ambient · Mixed by contract

Bring Interroll an RFQ package, not a brochure request

Share load units, peak windows, interface owners and site constraints. We respond with a structured evaluation path—throughput validation, controls matrix and acceptance gates included.